MTC Healthcare Demonstrator
The application of MRS within the Healthcare Sandpit was a great success. The simplicity and accuracy of install alongside the efficiency of the design was really impressive. There are clear opportunities for further use. From a programme and quality perspective the use of MRS in the right context is a no brainer.Conclusion from Balfour Beatty
The Impact
- MRS technology facilitates slimmer column and beam sections to reduce embodied carbon
- Pre-installed shuttering, and modular frames provided a 166% time saving on-site vs traditional foundation methods. Installation time was reduced from four hours to build and place two cages to one hour to place four cages
- Lifting points/interfaces with other structural components accurately positioned and controlled
- Laser cut precision guarantees concrete cover is achieved