The Challenge


Unipart Construction Technologies was asked to support the construction of new luxury apartments in London with UCT’s slim floor precast beam solution.

The apartments are located just 10 minutes walk from the iconic Wembley stadium in London, Regal London’s Fulton and Fifth residential development comprises five high rise residential towers with mixed-use retail and commercial units on the first few levels creating a vibrant live-work hub for residents.

The Solution


UCT worked collaboratively with PCE Ltd to supply MRS precast slim floor beams for the construction of two of the high-rise blocks. Integrating seamlessly with PCE’s Hybrid DfMA system, beams were delivered to site ‘just in time’, ready to be hoisted and installed immediately as part of a tightly controlled site construction programme.

PCE’s site team have praised the slim floor beams for their ease of installation and increased rigidity compared with other options, which made their job easier and contributed towards a faster, safer more efficient build programme.

The total programme consisted of 15 months.

 

40%

Pre-cast solution offers 40% faster installation than cast in-situ options

The Impact


  • Designed to be integrated seamlessly with PCE Ltd’s HybriDfMA system
  • Pre-cast solution offers 40% faster installation than cast in-situ options
  • Increased accuracy and rigidity aids ease of installation
  • Beam depth minimised to 200mm allows an additional floor to be included every 10 storeys
  • Engineered to work with standard hollowcore slab depths
image56

CONTACT US NOW


Learn more on how we can help you today.

Contact Us