The Solution
UCT worked collaboratively with PCE Ltd to supply MRS precast slim floor beams for the construction of two of the high-rise blocks. Integrating seamlessly with PCE’s Hybrid DfMA system, beams were delivered to site ‘just in time’, ready to be hoisted and installed immediately as part of a tightly controlled site construction programme.
PCE’s site team have praised the slim floor beams for their ease of installation and increased rigidity compared with other options, which made their job easier and contributed towards a faster, safer more efficient build programme.
The total programme consisted of 15 months.