High Rise Residential Development

40%
Pre-cast solution offers 40% faster installation than cast in-situ options
The Impact
- Designed to be integrated seamlessly with PCE Ltd’s HybriDfMA system
- Pre-cast solution offers 40% faster installation than cast in-situ options
- Increased accuracy and rigidity aids ease of installation
- Beam depth minimised to 200mm allows an additional floor to be included every 10 storeys
- Engineered to work with standard hollowcore slab depths
